US 19 Pedestrian Overpass

The scope of the project was to develop construction plans for a pedestrian overpass structure across SR 55 (US 19) at Harn Boulevard in Clearwater, Florida. US 19 was considered a Strategic Intermodal System (SIS) facility in Pinellas County. The proposed bridge was designed to be constructed within existing FDOT right-of-way, existing City of Clearwater right-of-way, and the existing City of Clearwater 49-ft easement. The bridge was designed to provide pedestrian connectivity between the east and west sides of US 19. Harn Boulevard was reconstructed to accommodate the pedestrian ramp. Milling and resurfacing were required along Harn Boulevard and the northbound frontage roads. The proposed switchback ramp located on the east side required new driveway entrances to the Bay Cove Apartments. The proposed improvements extended from south of Harn Boulevard (MP 17.283) to north of Harn Boulevard (MP 17.382) along US 19. The proposed pedestrian bridge was located on the south side of Harn Boulevard.

The overall bridge length is 235 ft, spanning the mainline and frontage roads. The switchback ramps consist of cast-in-place flat slabs with longitudinal grades meeting ADA requirements. The multi-level switchback ramps include multiple columns supported by precast pile foundations.