USF New Entry Drive and Parking Lot Reconfiguration

PGA designed a new entry/exit driveway with a traffic signal on W. Fowler Avenue to support the new USF Bulls football stadium. Existing parking lots and drainage ponds were redesigned to accommodate the new access road. Traffic-rated stormwater vaults were incorporated to recover the required stormwater volume while reducing the project footprint and minimizing disruption to campus during the academic year.